Oracle Primavera Cloud 24.11.0

Oracle Primavera Cloud 24.11.0

Oracle America, Inc.  ❘ Freeware
iOS
out of 4 votes
Latest Version
24.11.0
Safe to install
Title: Oracle Primavera Cloud 24.11.0
Operating Systems:
  • iOS
License: Freeware
Date added: 12/27/2024
Publisher: Oracle America, Inc.
Rating: Download client to rate!
Changelog: • Manage a personalized and comprehensive task list using My Tasks.
• Add new tasks from a quick-add drawer, and assign due dates to unplanned tasks from the hopper on the Work Plan.
• View task constraint icons on the Work Plan.
• Receive a notification when another user has modified or deleted your task plan.
• Use updated homescreen icons that are more consistent with the web interface.
• Minor bug fixes and changes to ensure a consistent and stable experience.

Screenshots (Click to view larger)

Related


Assemble Mobile

Extend the advantage of your federated Assemble models and model properties to your field team with Assemble Mobile: Easily access Assemble Projects, Models, and Saved Views while online and offline Navigate and interrogate the model …

Building Start

Building Start is a field services platform widely utilized in the construction and engineering sectors. It facilitates centralized test plan authoring and management and enables seamless transfer of test plans from the cloud to field …

Clue: Construction Management

Clue provides a solution to streamline and optimize various aspects of your construction operation, including assets, crew, and job sites.

CMiC Approvals

CMiC Mobile Approvals is a valuable tool that caters to the diverse needs within your organization, ensuring smoother handling of manual tasks like invoice approvals, change management processes, and various construction management …

Date Wheel date calculator

Date Wheel™ is a highly acclaimed date calculator that accurately calculates the time between two dates in months, weeks, days, and business days.

Facility Grid

Facility Grid is a cloud-based commissioning software platform that houses a range of digitized data concerning equipment and systems within a facility.
Secure and free downloads checked by UpdateStar

Stay up-to-date
with UpdateStar freeware.

Latest Reviews

Intel(R) Dynamic Tuning Technology Intel(R) Dynamic Tuning Technology
Intel's Dynamic Tuning Technology Optimizes Performance and Efficiency
N Native Instruments Una Corda
Native Instruments Una Corda: A Unique Sample Library for Soft Piano Tones
H Hybrid Mark Knight Expansion
Hybrid Mark Knight Expansion by AIR Music Tech GmbH Review
H Helper-Equalizer
Helper-Equalizer: Versatile Audio Tool for Custom Sound Tuning
H Helper-Saturator
Helper-Saturator: A Promising Tool for Saturation Enhancement
R Ravage Lite
Ravage Lite: A Lightweight Audio Enhancement App
UpdateStar Premium Edition UpdateStar Premium Edition
Keeping Your Software Updated Has Never Been Easier with UpdateStar Premium Edition!
Microsoft Edge Microsoft Edge
A New Standard in Web Browsing
Google Chrome Google Chrome
Fast and Versatile Web Browser
Microsoft Visual C++ 2015 Redistributable Package Microsoft Visual C++ 2015 Redistributable Package
Boost your system performance with Microsoft Visual C++ 2015 Redistributable Package!
Microsoft Visual C++ 2010 Redistributable Microsoft Visual C++ 2010 Redistributable
Essential Component for Running Visual C++ Applications
Microsoft OneDrive Microsoft OneDrive
Streamline Your File Management with Microsoft OneDrive

Latest Updates


Diagnosis: multitude 1.3.0

The game presents a narrative centered around the mysterious events involving Simon Psymort, Christopher Sauvernelle, the enigmatic Mennei, and their intertwined lives.

CarMoveApp, Auto Bluetooth 9.00.08

Important Notice Since over a year ago, it has become impossible to publish updates for applications that are not natively compiled for Android 13.

Jóvenes en Ruta 1.5

Jóvenes en Ruta is an application developed by the Ministry of Foreign Trade and Tourism (MINCETUR) designed to facilitate access for young Peruvians to discounts and promotional offers related to tourism activities.

Mokai Express 2.19.15

The Mokai Express service offers convenient delivery right to your doorstep. Download our official app today and place your order with ease.

Диеты для похудения быстро и п 2.0

After analyzing hundreds of different weight loss diets and nutrition methods, we have curated a selection of the most popular and effective plans for both women and men.

Oil Tanker Truck Driving Games .4

Oil Tanker Transporter Truck Simulator 2021 offers a realistic and immersive experience for those who enjoy heavy-duty oil cargo truck driving games.